Installation method of flush mount ceiling lights

When we install the flush mount ceiling light, we had better dig the hole before installing the ceiling, hole could be the proper for the area of the hanging plate, then we could ensure the position of the chandeliers.

flush mount ceiling light

Before installing the flush mount ceiling light, we had better fix it beside the lamp, then we could install the lamp in the hole, after then we could connect the power line, close the terminal cover, at the same time, we could fix the screw totally, when we fix the screw, amount of screw could not be less than the fixed hole, diameter of screw base could be connected with the hole, in the base, there is not installation hole, we also could punch the hole, in every light, amount of screw could not be less than three, center of gravity would be the same with the screw’s center.

flush mount ceiling light

At last, we could press the two sides of the lights, then we could put it into the hole of the ceiling, the jump ring had better suffer the ceiling plate, then we could use the hand press the shade, we could press it and fix, then the flush mount ceiling light is installed.